The AktivPLUS student residence built in Stuttgart-Vaihingen in 2018 demonstrates the implementation of a virtually climate-neutral building standard by reducing energy requirements and using solar energy. Wohnbau-Studio Planungsgesellschaft acquired several plots of land in the center of Stuttgart-Vaihingen for this purpose, on which several dilapidated apartment buildings still stood. The existing buildings were demolished and replaced by a new building. The result is a student residence with 126 residential units on an inner-city site. The living space covers around 2,644 m². The student residence is located on a busy road or intersection in Stuttgart-Vaihingen and therefore has particularly high requirements for noise protection against external noise. The aim of the project was to build the first German student hall of residence that generates more energy than it consumes during operation. The student residence was scientifically monitored and evaluated by siz energieplus over a period of three years.
In addition to an innovative energy concept, technical support during commissioning and detailed technical monitoring including operational optimization, the project also included the implementation of a user app specially developed for this purpose, which residents can use to monitor their own energy consumption.
Our services in the 2018-2021 processing period:
- Creation and implementation of a holistic, innovative energy concept (EGS-plan GmbH)
- Building physics planning and implementation (EGS-plan GmbH)
- HVAC and ELT planning (EGS-plan GmbH)
- Research project over 3 years:
- Creation and implementation of a detailed monitoring concept: All energy flows in the building (electricity, heating and DHW demand) are monitored as well as all energy generated in the building, drawn from the grid or fed into the public grid. This enables a fully comprehensive energy balance
building is thus made possible. Approx. 1,000 data points in the building were given a unique data point key and prepared for monitoring (time interval 1 to 15 min)
- Quality-assuring commissioning support: regular site inspections for quality-assuring support during construction and commissioning, checking the implementation of the requirements for system technology and the measuring equipment required for monitoring
- Detailed technical and energy monitoring and operational optimization: monitoring and optimization of the technical systems in the building during the commissioning phase and during operation
commissioning phase and during operation, monitoring energy consumption with regard to the "AktivPlus" objective, monitoring and optimizing the
comfort, raising awareness among residents with regard to energy-saving and resource-conserving living and usage behavior
- User interface (from the company mondayVision) for residents to check energy consumption values and other functions (e.g: Availability of washing machines,
information on parcel delivery and much more)
The R&D project is divided into five scientific and technical work packages. The focus of the work is on monitoring and optimizing the operation of the system with regard to high self-consumption of electricity and mapping the EnergiePLUS standard as well as comfort in the living spaces.
WP1 Development, implementation and commissioning of "AktivPLUS student residence"
WP2 Measurement and monitoring concept
WP 3 Development and testing of operating strategies
Development and evaluation of innovative operating strategies for student residences:
WP 4 Implementation and evaluation
WP 5 Project communication